Every Month of Delay
Is Revenue You Will
Not Recover.
Fixed-price delivery in 8 months. Know your cost before you break ground, not after you have committed to the land.
Delivered Projects
We have done this before.
Across three markets, on fixed contracts, with documented QA at every stage.

Delivered on a fixed contract. Crane-set in under two weeks.

Repeatable floor plates. Factory-finished interiors throughout.

98% complete ex-factory. Site scope limited to connections and commissioning.
This is one week of installation. Not one month. One week.
Integrated Architecture
Design. Engineer. Build.
One coordinated team.
Most developers spend months finding an architect who understands modular construction. We have already solved that. Our integrated architecture team, Studio 3Eight, specializes in modular-compatible design, delivers full BIM documentation, and works directly with our engineering team to eliminate the coordination gap that kills modular projects before they start.
Modular-native design
Architects who design for the factory, not around it. Every detail is coordinated with our engineering team before a shovel hits the ground.
Full BIM documentation
Schematic Design, Design Development, and Construction Documents delivered faster than US-based firms. Clash detection and quantities takeoff included.
Up to 25% lower architectural cost
Vietnam-based fees. International-standard output. The same coordination you would expect from a top-tier US firm at a fraction of the cost.
ESG and Capital Stack
Your LP is going to ask about carbon.
Here is your answer.
Institutional lenders and ESG-conscious limited partners increasingly require environmental impact documentation as part of project approval. Factory-built modular produces 43% lower CO2 emissions during construction than equivalent site-built projects, based on peer-reviewed research, not marketing copy.
- Material waste generated on every floor
- On-site labor exposed to weather and schedule risk
- No standardized environmental documentation
- Embodied carbon difficult to measure or report to LPs
- 43% lower CO2 emissions during construction (University of Florida, 2022)
- Factory environment eliminates weather-driven carbon spikes
- QA documentation available for every module
- Citable peer-reviewed research available for lender and LP packages
Source: Kouhirostami and Chini, Modular and Offsite Construction Summit, Edmonton 2022.
Start Here
Bring us your deal.
Tell us your program, your site, and your timeline. We will tell you honestly whether modular pencils and what the numbers look like. No pitch. No obligation. Just a straight answer.
Typically responded to within 1 business day.