On Budget.
On Schedule.
Documented.
Fixed-price delivery in 8 months. No change orders. IBC and HUD code compliant. Every module inspected and documented before it leaves the factory. Factory-built construction that meets your schedule, your budget, and your environmental commitments.
Every Factory Modular project ships with a full compliance record. Available for permit submission, public record, and post-occupancy audit.
Delivered Projects
Delivered on time. On budget. Documented.
Workforce housing, transitional housing, and municipal residential across three markets. Fixed contracts. Factory QA at every stage.

Multi-unit workforce housing delivered to a fixed budget. No change orders. Occupancy in month eight.

Rapid-deployment units for a housing authority. Factory-finished interiors, full MEPF installed at delivery.

98% complete ex-factory. Site work limited to foundations, connections, and final commissioning.
Compliance and QA
Every module has
a paper trail.
Public projects require documentation that conventional construction rarely produces. Factory Modular delivers a complete build record: IBC and HUD certifications, Conqa factory inspection logs, module-by-module QA records, and MEPF system documentation. All of it structured for permit submission, public record, and post-occupancy audit.
When a council member or oversight body asks how the project was built, you have an answer on file.
Request a compliance documentation sampleIBC and HUD code compliant
Every module is designed and certified to International Building Code and HUD standards before shipment. Documentation is structured for permit submission and public record from day one.
Conqa real-time QA documentation
Remote factory inspection via Conqa. Every weld, connection, and finish is recorded in real time. Project owners and inspectors have access to a complete, timestamped build record.
Fixed-price contracts, no change orders
Your board approved a budget. We deliver to it. Fixed-price contracts eliminate the cost escalation that creates political risk and public accountability problems on conventional projects.
8-month delivery protects your timeline
Delays on public projects become headlines. An 8-month groundbreak-to-occupancy schedule, backed by factory production and documented milestones, gives you a defensible timeline before you commit.
Sustainability and Accountability
Your constituents are going to ask
about environmental impact.
Public agencies are increasingly required to document the environmental impact of capital projects. Factory-built modular produces 43% lower CO2 emissions during construction than equivalent site-built projects, based on peer-reviewed research, not marketing copy.
- Material waste generated on every floor
- On-site labor exposed to weather and schedule risk
- No standardized environmental documentation
- Embodied carbon difficult to measure or report publicly
- 43% lower CO2 emissions during construction (University of Florida, 2022)
- Factory environment eliminates weather-driven carbon spikes
- QA documentation available for every module
- Citable peer-reviewed research available for public reporting and oversight
Source: Kouhirostami and Chini, Modular and Offsite Construction Summit, Edmonton 2022.
This is one week of installation. A documented, inspected, fixed-price project delivered to schedule.
Start Here
Let's build better.
Tell us your unit count, your site, and your timeline. We will tell you honestly whether modular works for your project and what the numbers look like. No pitch. No obligation. A straight answer.
Typically responded to within 1 business day.